Skip to main content
File #: 20-124    Version: 1 Name:
Type: Action Item Status: Passed
File created: 3/11/2020 In control: Borough Assembly
On agenda: 3/16/2020 Final action: 3/16/2020
Title: Motor Pool Shop Repair Design Contract
Attachments: 1. Director Cotta Memorandum, 2. WJE Motor Pool Shop Repair Design Work Proposal